Description: TEXAS INSTRUMENTS 2N3502 Bipolar Transistor - BJT PNP TO-5 GOLD LONG LEADS NEW OLD STOCK LOT 30876 F27 INCLOSURE MATERIALMETALOVERALL LENGTH0.250 INCHES NOMINALTERMINAL LENGTH1.500 INCHES MINIMUMOVERALL DIAMETER0.359 INCHES NOMINALEND ITEM IDENTIFICATIONMODEL NO. 2021INTERNAL CONFIGURATIONJUNCTION CONTACTELECTRODE INTERNALLY-ELECTRICALLY CONNECTED TO CASECOLLECTORMOUNTING METHODTERMINALTERMINAL CIRCLE DIAMETER0.200 INCHES NOMINALFEATURES PROVIDEDHERMETICALLY SEALED CASESEMICONDUCTOR MATERIALSILICONVOLTAGE RATING IN VOLTS PER CHARACTERISTIC45.0 MAXIMUM BREAKDOWN VOLTAGE, COLLECTOR-TO-BASE, EMITTER OPEN AND 45.0 MAXIMUM BREAKDOWN VOLTAGE, COLLECTOR-TO-EMITTER, BASE OPEN AND 5.0 MAXIMUM BREAKDOWN VOLTAGE, EMITTER-TO-BASE, COLLECTOR OPENCURRENT RATING PER CHARACTERISTIC600.00 MILLIAMPERES SOURCE CUTOFF CURRENT MAXIMUMPOWER RATING PER CHARACTERISTIC700.0 MILLIWATTS SMALL-SIGNAL INPUT POWER, COMMON-COLLECTOR MINIMUMMAXIMUM OPERATING TEMP PER MEASUREMENT POINT200.0 DEG CELSIUS JUNCTIONSPECIAL FEATURESJUNCTION PATTERN ARRANGEMENT: PNPTERMINAL TYPE AND QUANTITY3 UNINSULATED WIRE LEADSPECIFICATION/STANDARD DATA80131-RELEASE4802 PROFESSIONAL/INDUSTRIAL ASSOCIATION SPECIFICATION
Price: 19.95 USD
Location: Stanton, California
End Time: 2024-11-15T22:20:22.000Z
Shipping Cost: N/A USD
Product Images
Item Specifics
Restocking Fee: No
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Number of Pins: 3
Series: 2N3502
Type: PNP BJT
MPN: 2N3502
Brand: Texas Instruments
Package/Case: TO-5